BA · News · 20260916N
Aerospace Supply Chain Constraints
BOEING CO · 2026-09-16 · Importance 46 · Surprise 42 · In source text
Boeing continues to face challenges obtaining 787 engine deliveries. The engine supply issue is occurring alongside 777X testing and could extend into next year. These constraints may affect widebody production and delivery timing.
Key facts
- The U.S. Navy awarded Boeing a $562 million fixed-price incentive contract for the initial production of the MQ-25A Stingray. source
- Boeing identified that a potential strike by the SPEEA engineering union could disrupt major certification and production efforts. source
- The MQ-25A contract covers three Lot 1 Stingrays and long-lead components for three Lot 2 MQ-25As, with Lot 1 deliveries expected in 2029. source
- Wings production at its Renton, Washington, factory is a hold up for 737 Max production, and Boeing has plans to address it. source
- Boeing faces ongoing challenges with 787 engine deliveries that could extend into next year. source
Impact estimates
| metric | direction | stage | expected | basis |
|---|---|---|---|---|
| revenue | positive | committed | +1.9% | The U.S. Navy awarded Boeing a $562 million fixed-price incentive contract for the initial production of the MQ-25A Stingray. |
| revenue | negative | contingent | — | Boeing identified that a potential strike by the SPEEA engineering union could disrupt major certification and production efforts. |
| operating_income | negative | contingent | — | Boeing identified that a potential strike by the SPEEA engineering union could disrupt major certification and production efforts. |