BRK-B · News · 20261014N

Autonomous Trucking Deployment

BERKSHIRE HATHAWAY INC · 2026-10-14 · Importance 31 · Surprise 42 · In source text

Pilot Travel Centers and Tesla opened their first heavy-duty Megacharger site at a Pilot location in Ellabell, Georgia, with six charging stalls for electric trucks. Twelve additional heavy-duty sites are under construction, including locations in California, Texas, and Nevada, and three are nearly finished. The planned network targets major freight corridors including I-5 and I-10, with each site expected to have four to eight stalls using Tesla V4 cabinet technology. Tesla says each stall can deliver up to 1.2 megawatts, enabling a Tesla Semi to recover 60% of its charge in 30 minutes.

Key facts

Impact estimates

metricdirectionstageexpectedbasis
revenuepositiveprobable—Berkshire Hathaway-owned Pilot Travel Centers and Tesla opened their first heavy-duty Megacharger site at a Pilot location.
revenuepositivecommitted—Twelve additional heavy-duty Megacharger sites for Pilot are under construction.
assetspositivecommitted—Twelve additional heavy-duty Megacharger sites for Pilot are under construction.
revenuepositiveprobable—Three Megacharger sites were described as nearly finished: a Flying J in Tulare, Calif., scheduled to open Oct. 9; a Flying J in Fort…
revenuepositivecontingent—The Megacharger network is planned for select Pilot locations along I-5, I-10, and other major freight corridors in California, Georgia,…