ES · 10-Q · 2026Q3 · Full report

Grid Modernization and Reliability

EVERSOURCE ENERGY · 2026-11-06 · Importance 25 · Surprise 24 · In source text

Eversource says its transmission projects in Connecticut, Massachusetts and New Hampshire are intended to improve grid reliability, meet customer demand for power and strengthen resilience. The Greater Cambridge Energy Program is building the company’s first underground transmission substation, with associated lines and duct banks, to address increased electric demand in the Cambridge region; the project is estimated to cost approximately $1.84 billion. ISO-NE selected a joint Eversource–Central Maine Power proposal as its preferred solution for a project intended to increase transmission capacity between Maine and New Hampshire, strengthen the northern-to-southern New England interface and accommodate at least 1,200 MW of onshore wind. Eversource’s share of that project’s estimated $2.2 billion cost is approximately $700 million, with service anticipated in 2032.

Key facts

Impact estimates

metricdirectionstageexpectedbasis
cashnegativeprobable0.0%In September 2026, ISO-NE selected Eversource's joint proposal with Central Maine Power as the preferred solution for a transmission…
assetspositiveprobable0.0%In September 2026, ISO-NE selected Eversource's joint proposal with Central Maine Power as the preferred solution for a transmission…
cashnegativeprobable0.0%Eversource's Greater Cambridge Energy Program is estimated to cost approximately $1.84 billion: $1.38 billion for transmission and $460…
assetspositiveprobable0.0%Eversource's Greater Cambridge Energy Program is estimated to cost approximately $1.84 billion: $1.38 billion for transmission and $460…