Capital Expenditure Program

ONEOK INC /NEW/ · 2026-08-04 · Importance 55 · Surprise 50 · From source text

ONEOK invested $1.5 billion in capital expenditures during the six months ended June 30, 2026, compared with $1.4 billion in the prior-year period. The company expects total 2026 capital expenditures of $2.7 billion to $3.2 billion, funded typically through operating cash flows and short- and long-term debt. Major projects include the $700 million Texas City Logistics export terminal, $485 million Medford fractionator rebuild, $350 million Eiger Express Pipeline and $280 million MBTC Pipeline. The Bighorn plant is expected to cost $365 million, while the Greater Denver pipeline expansion is expected to cost $480 million and increase system capacity by 35 MBbl/d.

Key facts

Impact estimates

metricdirectionstageexpectedbasis
assetspositiveprobable+2.1%We expect total capital expenditures of $2.7 billion - $3.2 billion in 2026.
cashnegativeprobable-2.1%We expect total capital expenditures of $2.7 billion - $3.2 billion in 2026.
assetspositivecommitted+0.9%Texas City Logistics export terminal approximate cost: $700 million; scope: 400 MBbl/d liquified petroleum gas export terminal in Texas…
cashnegativecommitted-0.9%Texas City Logistics export terminal approximate cost: $700 million; scope: 400 MBbl/d liquified petroleum gas export terminal in Texas…
assetspositivecommitted+0.6%Greater Denver pipeline expansion approximate cost: $480 million; scope: increase total system capacity by 35 MBbl/d with additional…
cashnegativecommitted-0.6%Greater Denver pipeline expansion approximate cost: $480 million; scope: increase total system capacity by 35 MBbl/d with additional…
assetspositivecommitted+0.5%Bighorn plant approximate cost: $365 million; expected completion Mid-2027; scope: 300 MMcf/d processing plant with carbon dioxide treater…
cashnegativecommitted-0.5%Bighorn plant approximate cost: $365 million; expected completion Mid-2027; scope: 300 MMcf/d processing plant with carbon dioxide treater…
assetspositivecommitted+0.4%Eiger Express Pipeline approximate cost: $350 million; scope: 450-mile, 48-inch natural gas pipeline from the Permian Basin to Katy,…
cashnegativecommitted-0.4%Eiger Express Pipeline approximate cost: $350 million; scope: 450-mile, 48-inch natural gas pipeline from the Permian Basin to Katy,…
cashnegativerealized-0.4%Cash used in investing activities for the six months ended June 30, 2026: $(1,789) million; for the six months ended June 30, 2025:…
assetspositivecommitted+0.3%MBTC Pipeline approximate cost: $280 million; scope: 24-inch pipeline from Mont Belvieu, Texas, storage facility to the new Texas City,…