WEC · 10-Q · 2026Q2 · Full report

Transmission Infrastructure Investment

WEC ENERGY GROUP, INC. · 2026-08-04 · Importance 64 · Surprise 42 · In source text

WEC expects to provide approximately $645 million of capital contributions to American Transmission Company (ATC) from 2026 through 2028. Its share of MISO Tranche 1 and Tranche 2.1 investments is estimated at approximately $700 million and $400 million, respectively, between 2026 and 2030. These projects support MISO's long-range transmission planning and grid upgrades needed to accommodate a shift toward lower-carbon generation.

Key facts

Impact estimates

metricdirectionstageexpectedbasis
assetspositiveprobable+3.9%We currently forecast that our share of ATC's projected capital expenditures over the next five years will be approximately $4.1 billion.
cashnegativeprobable-3.9%We currently forecast that our share of ATC's projected capital expenditures over the next five years will be approximately $4.1 billion.
operating_incomenegativerealized-2.4%During the six months ended June 30, 2026, 358.8 million of costs were billed to our electric utilities by transmission providers,…
assetspositiveprobable+1.0%WEC's portion of the investment in MISO Tranche 1 is estimated to be approximately $700 million between 2026 and 2030 and Tranche 2.1…
cashnegativeprobable-1.0%WEC's portion of the investment in MISO Tranche 1 is estimated to be approximately $700 million between 2026 and 2030 and Tranche 2.1…
assetspositiveprobable+0.6%We expect to provide total capital contributions to ATC of approximately $645 million from 2026 through 2028.
cashnegativeprobable-0.6%We expect to provide total capital contributions to ATC of approximately $645 million from 2026 through 2028.
assetspositiverealized+0.4%WE and WPS deferred $194.5 million of transmission costs as of the second quarter of 2026 billed by transmission providers (difference…